First Pass Filtration and Chiller Tanks
The beverage then passes through a first pass filtration of about 1 micron, before being transferred via stainless steel piping to the chiller tanks. The beverage is then chilled to 1 degree Celsius, which takes between approximately 4 hours, depending on the temperature of the beverage going in
Gas Management Systems
After the beverage is brought down to 1 degree Celsius, it passes through our gas management system where dissolved oxygen is further reduced and C02 is added. Again, all processes run through pre-fit stainless-steel piping, to provide maximum O2 control, while also offering superior microbial protection.
Canning and Packaging
Our canning line operates at a rate of 3000 cans per hour, focusing primarily on 355ml sleek beverage cans. Once the flashed beverage is transferred to the canning room, cans are filled and sealed in an inert environment for oxygen and environmental mitigation. Labels are added inline, and cans are labeled and palleted where they are stored in our licensed and secure temperature-controlled storage facility.